suggestion that something had occurred on the Isthmus to make the
lock type of the canal less feasible than it was supposed to be
when the reports were made and the policy determined on led to a
visit to the Isthmus of a board of competent engineers to examine
the Gatun dam and locks, which are the key of the lock type. The
report of that board shows nothing has occurred in the nature of
newly revealed evidence which should change the views once formed
in the original discussion. The construction will go on under a
most effective organization controlled by Colonel Goethals and his
fellow army engineers associated with him, and will certainly be
completed early in the next administration, if not before.
Some type of canal must be constructed. The lock type has been
selected. We are all in favor of having it built as promptly as
possible. We must not now, therefore, keep up a fire in the rear
of the agents whom we have authorized to do our work on the
Isthmus. We must hold up their hands, and speaking for the
incoming administration I wish to say that I propose to devote all
the energy possible and under my control to pushing of this work
on the plans which have been adopted, and to stand behind the men
who are doing faithful, hard work to bring about the early
completion of this, the greatest constructive enterprise of modern
times.